P3 101 Presentations

These presentations provide an introduction to the structure and benefits of public-private partnerships. They offer a good starting point for determining whether a P3 is a good option for your infrastructure project.

Procurement Docs

These sample RFPs can get you started with either hiring an adviser or beginning a Progressive P3 process.

Papers

Progressive Design Build Procurement Guide

The progressive design-build method of delivering infrastructure projects combines the owner’s direct control over project concept and detailed design with the design-builder’s innovation – and creates a single point of accountability. Given the growing popularity of the progressive design-build (PDB) delivery method, the Water Design-Build Council (WDBC) has developed this user-friendly procurement guide, along with a suggested set of request for qualifications (RFQ) and request for proposal (RFP) model documents for conducting PDB procurement effectively and in accordance with best practices.

Download Guide (.docx)

PROGRESSIVE DESIGN BUILD BASICS

Progressive Design-Build combines the benefits of design-build (DB), including single-point of accountability, with the benefits of construction-management-at-risk (CMAR), including preconstruction services and owner input throughout the project execution.

This article covers all the basics.